Blog

Bathroom Installation

Installation


The client briefed us of their vision and requirements to achieve the bathroom they envisioned. The plans had already been drawn up so we worked to their specifications. Using our knowledge and expertise the bathroom was finished to an extremely high standard. We had been given a 2-week deadline to fully complete the work. This involved completely stripping the bathroom back to the bare walls and re-plastering, relaying all the pipework and fitting the suite.

Finished Result


At the end of the installation, the client was very pleased with the work Z2 Engineering had done. We pride ourselves on a superb client service and delivering pristine installations on time and on budget.

Contact Us


If you would like to us to quote to fully fit out your bathroom please call us on: 01977 246960.

z2 engineering batroom prepare
z2 engineering bathroom pipe fitting
z2 engineering working shower

You currently have JavaScript disabled!

This site requires JavaScript to be enabled. Some functions of the site may not be usable or the site may not look correct until you enable JavaScript. You can enable JavaScript by following this tutorial. Once JavaScript is enabled, this message will be removed.